Situational · Ethical Dilemma
You're a project engineer. The 28-day cylinder breaks for two columns placed last month came back 15% under design strength. Your PM says to sit on the results until the 56-day breaks come in — "it always gains" — and not mention it to the owner or the structural engineer yet. The floors above are already being formed. What do you do?